Project Description
Due to a change of use of an existing warehouse our client requested that all existing steelwork was prepared and coated with a 120 minute intumescent system.
All existing coatings and corrosion were removed by wet abrasive blasting. A Jotun intumescent system was then applied by airless spray to the manufacturer’s dry film specification.